References
Discover our ongoing and completed engineering and commissioning projects.
Latest flagship projects
A selection of our landmark projects.
CERNAY-LES-REIMS240 MW / 480 MWh
PVBANIE 2406 MWp
PVKARAVASTA140 MWp
All our references
A complete selection of our projects across owner engineering, commissioning, automation and HV/PV engineering.
Owner Engineering
| Project | Type | Power & connection | Client | Year | Status |
|---|---|---|---|---|---|
| Confidential France | BESS | 190 MW / 380 MWh 225 kV | Confidential | 2025-2027 | In progress |
| Confidential Large scale BESS project · France | BESS | 50 MW / 100 MWh | Confidential | 2025-2027 | In progress |
| Confidential Large-scale battery storage project · France | BESS | 50 MW / 103 MWh | Confidential | 2024-2026 | In progress |
| CERNAY-LES-REIMS Largest BESS project in Fra,ce · France | BESS | 240 MW / 480 MWh 220kV | TagEnergy | 2024-2026 | Completed |
| Due diligence — | BESS | 18 MW / 36 MWh | Confidential | 2025 | Completed |
| BANIE 2 Large scale PV project · Poland | PV | 406 MWp 400kV | Unity Power | 2025 | Completed |
| Due diligence — | BESS | 185 MW / 370 MWh | Confidential | 2024 | Completed |
- Power
- 190 MW / 380 MWh
- Grid connection
- 225 kV
- Client
- Confidential
- Year
- 2025-2027
- Status
- In progress
Project management assistance (HV substation and BESS BoP) for the preliminary design and contractor consultation phase.
- Power
- 50 MW / 100 MWh
- Client
- Confidential
- Year
- 2025-2027
- Status
- In progress
Owner Engineering
- Power
- 50 MW / 103 MWh
- Client
- Confidential
- Year
- 2024-2026
- Status
- In progress
Owner engineering, from consultation and procurement phases to commissioning.
- Power
- 240 MW / 480 MWh
- Grid connection
- 220kV
- Client
- TagEnergy
- Year
- 2024-2026
- Status
- Completed
Owner Engineer form early stage of the project until Final Completion
- Power
- 18 MW / 36 MWh
- Client
- Confidential
- Year
- 2025
- Status
- Completed
Technical audit and due diligence prior to the acquisition of a third-party-developed BESS power station.
- Power
- 406 MWp
- Grid connection
- 400kV
- Client
- Unity Power
- Year
- 2025
- Status
- Completed
Owner engineering assistance for HV and MV systems of this large-scale photovoltaic project connected to the 400 kV network.
- Power
- 185 MW / 370 MWh
- Client
- Confidential
- Year
- 2024
- Status
- Completed
Technical audit and due diligence prior to the acquisition of a third-party-developed BESS power station.
HV & PV Engineering
| Project | Type | Power & connection | Client | Year | Status |
|---|---|---|---|---|---|
| Confidential France | BESS | 200 MW / 400 MWh 225 kV | Confidential | 2025 | In progress |
| Confidential France | BESS | 50 MW / 100 MWh 90 kV | Confidential | 2025 | In progress |
| HV substation projects Multiple 63/225/400 kV substations · France | BESS | — 63 / 225 / 400 kV | Confidential | 2025 | In progress |
| Confidential France | BESS | 100 MW / 400 MWh | Tag Energy | 2025 | Completed |
| Confidential New Caledonia | Hybrid PV + BESS | 6 MWp PV + 3 MW BESS | Confidential | 2025 | Completed |
| Confidential Dominican Republic | PV | 50 MWp | Confidential | 2025 | Completed |
| APS Tchad Tender submission design · Chad | Hybrid PV + BESS | PV 7 MWp + BESS 3.5 MW / 7 MWh | Tractafric | 2025 | Completed |
| Revamping PV plant France | PV | — | Engie Green | 2025 | Completed |
| Confidential France | BESS | 100 MW / 400 MWh | Confidential | 2025 | Completed |
| Akuo GEM Product France | PV | 0.08 MWp | AKUO | 2025 | Completed |
| 132 kV BESS Spain | BESS | 100 MW / 200 MWh 132 kV | Confidential | 2024 | Completed |
| Confidential France | BESS | 50 MW / 100 MWh | Confidential | 2024 | Completed |
| Confidential France | PV | 8 MWp | La Française de l'Énergie | 2024 | Completed |
| Tabiella Spain | BESS | 100 MW / 200 MWh | TagEnergy | 2024 | Completed |
| Vale das Gralhas Portugal | PV | 13 MWp | TagEnergy | 2024 | Completed |
| 40 MWp PV plant France | PV | 40 MWp | Confidential | 2024 | In progress |
| INGERSLEV A Denmark | PV | 65 MW | BeGreen | 2024 | Completed |
| Confidential Spain | PV | 30 MWp | Confidential | 2023 | Completed |
| Suncable AAPL Australia Asia Power Link · Australia | PV | 6 GWp (72 MWp blocks) | Confidential | 2022 | Completed |
- Power
- 200 MW / 400 MWh
- Grid connection
- 225 kV
- Client
- Confidential
- Year
- 2025
- Status
- In progress
DCE and EPC consultation.
- Power
- 50 MW / 100 MWh
- Grid connection
- 90 kV
- Client
- Confidential
- Year
- 2025
- Status
- In progress
Pre-dimensioning of an HV/MV transformer.
- Power
- —
- Grid connection
- 63 / 225 / 400 kV
- Client
- Confidential
- Year
- 2025
- Status
- In progress
Preliminary design of 63, 90, 225 and 400 kV high-voltage substations for BESS projects (connection request phase).
- Power
- 100 MW / 400 MWh
- Client
- Tag Energy
- Year
- 2025
- Status
- Completed
Sizing of the HV transformer.
- Power
- 6 MWp PV + 3 MW BESS
- Client
- Confidential
- Year
- 2025
- Status
- Completed
Basic engineering design (BED).
- Power
- 50 MWp
- Client
- Confidential
- Year
- 2025
- Status
- Completed
Reactive power capacity study at the connection point for three voltages (Un, Umin, Umax).
- Power
- PV 7 MWp + BESS 3.5 MW / 7 MWh
- Client
- Tractafric
- Year
- 2025
- Status
- Completed
Basic engineering design (BED) and APS design for tender submission.
- Power
- —
- Client
- Engie Green
- Year
- 2025
- Status
- Completed
Revamping study to change the PV modules.
- Power
- 100 MW / 400 MWh
- Client
- Confidential
- Year
- 2025
- Status
- Completed
Sizing of HV transformer (modelling)
- Power
- 100 MW / 200 MWh
- Grid connection
- 132 kV
- Client
- Confidential
- Year
- 2024
- Status
- Completed
Third-party preliminary design review and update (132 kV substation + BESS).
- Power
- 50 MW / 100 MWh
- Client
- Confidential
- Year
- 2024
- Status
- Completed
Basic engineering design (BED).
- Power
- 8 MWp
- Year
- 2024
- Status
- Completed
Basic engineering design (BED).
- Power
- 100 MW / 200 MWh
- Client
- TagEnergy
- Year
- 2024
- Status
- Completed
Basic engineering design (BED).
- Power
- 13 MWp
- Client
- TagEnergy
- Year
- 2024
- Status
- Completed
Basic engineering design (BED).
- Power
- 40 MWp
- Client
- Confidential
- Year
- 2024
- Status
- In progress
Optimization of the PV plant layout for different table configurations using PVsyst. Preparation of detailed layout drawings.
- Power
- 30 MWp
- Client
- Confidential
- Year
- 2023
- Status
- Completed
Optimization of the PV plant layout for different table configurations using PVsyst. Preparation of detailed layout drawings.
- Power
- 6 GWp (72 MWp blocks)
- Client
- Confidential
- Year
- 2022
- Status
- Completed
Sizing of DC cables using thermal and cycling calculations to optimize cable sections and trench profiles.
Commissioning
| Project | Type | Power & connection | Client | Year | Status |
|---|---|---|---|---|---|
| Clashwilliam PV plant Ireland | PV | 50 MWp | Voltalia / ESB | 2026 | In progress |
| Carriglong PV plant Ireland | PV | 42 MWp | Voltalia / ESB | 2026 | In progress |
| Middleton House PV plant Ireland | PV | 75 MWp | Voltalia / ESB | 2025-2026 | In progress |
| BESS CCG Blénod France | BESS | 17 MW / 18 MWh | Agregio Solutions | 2024-2025 | Completed |
| Confidential Italy | BESS | 12 MW | Confidential | 2024 | Completed |
| KARAVASTA Largest PV plant in the Balkans · Albania | PV | 140 MWp 220 kV | Voltalia | 2024 | Completed |
| Hybrid Plant France | Hybrid PV + BESS | PV 20 MWp + BESS 7.5 MW | Confidential | 2023 | Completed |
- Power
- 50 MWp
- Year
- 2026
- Status
- In progress
Commissioning management.
- Power
- 42 MWp
- Year
- 2026
- Status
- In progress
Commissioning management.
- Power
- 75 MWp
- Year
- 2025-2026
- Status
- In progress
Commissioning management: on-site testing, document preparation and review, grid connection tests.
- Power
- 17 MW / 18 MWh
- Client
- Agregio Solutions
- Year
- 2024-2025
- Status
- Completed
On site commissioning
- Power
- 12 MW
- Client
- Confidential
- Year
- 2024
- Status
- Completed
Supervision of overall commissioning and testing of communication and SCADA systems.
- Power
- 140 MWp
- Grid connection
- 220 kV
- Client
- Voltalia
- Year
- 2024
- Status
- Completed
Supervision of overall commissioning, including subcontractor supervision, electrical testing, SCADA and tracker commissioning
- Power
- PV 20 MWp + BESS 7.5 MW
- Client
- Confidential
- Year
- 2023
- Status
- Completed
Commissioning support and complex problem resolution for this hybrid solar PV and battery storage project.
Automation & SCADA
| Project | Type | Power & connection | Client | Year | Status |
|---|---|---|---|---|---|
| 12 BESS Projects France | BESS | From 2 to 15 MW | Confidential | 2026-2027 | In progress |
| Confidential France | PV | 15.73 MWp 20kV | Confidential | 2026 | In progress |
| Confidential Automation system revamping · France | PV | 15 MW | Confidential | 2025-2026 | Completed |
| VERT France | Hybrid PV + BESS | 78 MWp | BESS 19 MW / 31 MWh 20kV | ZE Energy | 2025 | Completed |
| Confidential Italy | BESS | 100 MW / 800 MWh | Confidential | 2025 | Completed |
| Confidential Revamping automation · France | Hybrid PV + BESS | PV 8 MWp / 8 MVA + BESS 6 MW / 13 MWh | Confidential | 2024 | Completed |
| Gièvres France | Hybrid PV + BESS | PV 18 MWp + BESS 8 MW (2h) | ZE Energy | 2024 | Completed |
| Montfalcone Italy | BESS | 12 MW / 7 MWh | ZE Energy | 2024 | Completed |
- Power
- From 2 to 15 MW
- Client
- Confidential
- Year
- 2026-2027
- Status
- In progress
Turn-key SCADA + PPC.
- Power
- 15.73 MWp
- Grid connection
- 20kV
- Client
- Confidential
- Year
- 2026
- Status
- In progress
Turnkey SCADA + PPC
- Power
- 15 MW
- Client
- Confidential
- Year
- 2025-2026
- Status
- Completed
Turn-key SCADA + PPC as a revamping of an existing site.
- Power
- 78 MWp | BESS 19 MW / 31 MWh
- Grid connection
- 20kV
- Client
- ZE Energy
- Year
- 2025
- Status
- Completed
Automation engineering and commissioning support.
- Power
- 100 MW / 800 MWh
- Client
- Confidential
- Year
- 2025
- Status
- Completed
Automation architecture engineering
- Power
- PV 8 MWp / 8 MVA + BESS 6 MW / 13 MWh
- Client
- Confidential
- Year
- 2024
- Status
- Completed
Automation commissioning support and revamping.
- Power
- PV 18 MWp + BESS 8 MW (2h)
- Client
- ZE Energy
- Year
- 2024
- Status
- Completed
Automation commissioning support.
- Power
- 12 MW / 7 MWh
- Client
- ZE Energy
- Year
- 2024
- Status
- Completed
Automation commissioning support and CEI 0-16 certification.
We're interested in your project
Contact us to discuss.
