All our references

A complete selection of our projects across owner engineering, commissioning, automation and HV/PV engineering.

Owner Engineering

Confidential
France
BESS
Power
190 MW / 380 MWh
Grid connection
225 kV
Client
Confidential
Year
2025-2027
Status
In progress

Owner's engineering on the 225 kV HV substation and the BESS balance of plant during the preliminary design and tender phases.

Confidential
France
BESS
Power
50 MW / 100 MWh
Client
Confidential
Year
2025-2027
Status
In progress

Owner's engineering, from substation design and preparation of the tender documents for all lots through to works supervision, commissioning and RTE forms follow-up.

Confidential
France
BESS
Power
50 MW / 100 MWh
Grid connection
90 kV
Client
Confidential
Year
2024-2026
Status
In progress

Owner's engineering on the substation and MV transformer of this 90 kV BESS project during the preliminary design and tender phases.

CERNAY-LES-REIMS
Largest BESS project in France
France
BESS
Power
240 MW / 480 MWh
Grid connection
220 kV
Client
TagEnergy
Year
2024-2026
Status
Completed

Owner's engineering across the entire project, from the tender phase through to the end of construction, including performance testing and certification.

BANIE 2
Large scale PV project
Poland
PV
Power
406 MWp
Grid connection
400kV
Client
Unity Power
Year
2025
Status
Completed

Owner engineering assistance for HV and MV systems of this large-scale photovoltaic project connected to the 400 kV network.

Confidential
BESS
Power
18 MW / 36 MWh
Client
Confidential
Year
2025
Status
Completed

Technical due diligence of a BESS project as part of an acquisition: review of administrative permits, technical risk assessment, contractual analysis and audit report.

Confidential
France
BESS
Power
200 MW / 400 MWh
Grid connection
225 kV
Client
Confidential
Year
2025
Status
Completed

Sizing of the transformers and 225 kV substation, single-line diagram and layout plan, preparation of the tender documents and review of the EPC offers.

Confidential
BESS
Power
185 MW / 370 MWh
Client
Confidential
Year
2024
Status
Completed

Technical due diligence of two BESS projects for a potential acquirer: review of the HV substation sizing and layout, permit review, building-permit consistency check and project schedule review.

Confidential
Denmark
PV
Power
65 MW
Client
Confidential
Year
2024
Status
Completed

Owner's engineering covering the SCADA, PPC and communication network, together with commissioning management: follow-up meetings, commissioning management plan and planning, and verification of the sub-contractors' test procedures and templates.

HV & PV Engineering

Confidential
France
BESS
Power
50 MW / 100 MWh
Client
Confidential
Year
2024-2026
Status
Completed

Owner engineering, from consultation and procurement phases to commissioning.

Confidential
Chad
Hybrid PV + BESS
Power
7 MWp + 3.5 MW / 7 MWh
Grid connection
33 kV
Client
Confidential
Year
2025
Status
Completed

Basic engineering design for tender submission.

Confidential
Dominican Republic
PV
Power
50 MWp
Client
Confidential
Year
2025
Status
Completed

Reactive power capability study under PowerFactory: review of the client's electrical model and determination of the maximum reactive import and export capacities at the point of connection.

Confidential
France
PV
Power
0.08 MWp
Client
Confidential
Year
2025
Status
Completed

Review of the electrical engineering of a containerized solar solution.

Confidential
France
BESS
Power
100 MW / 400 MWh
Grid connection
90 kV
Client
Confidential
Year
2025
Status
Completed

Preliminary studies and supplier consultation for the early procurement of the 90 kV HV transformers: electrical modelling, technical specification, sizing report and offer analysis.

Confidential
France
HV Substation
Power
Grid connection
63 / 90 / 225 / 400 kV
Client
Confidential
Year
2025
Status
In progress

Preliminary design of 63, 90, 225 and 400 kV high-voltage substations for BESS projects (connection request phase).

Confidential
France
PV
Power
28 MWp
Client
Confidential
Year
2025
Status
Completed

Troubleshooting and revamping study to change the PV modules.

Confidential
Spain
BESS
Power
100 MW / 200 MWh
Grid connection
132 kV
Client
Confidential
Year
2024
Status
Completed

Third-party review and update of the preliminary design covering the 132 kV substation and the BESS.

Confidential
France
BESS
Power
50 MW / 100 MWh
Client
Confidential
Year
2024
Status
Completed

Pre-sizing of the transformer and 90 kV substation, preparation of the tender documents and review of supplier offers.

Confidential
France
PV
Power
8 MWp
Grid connection
20 kV
Client
Confidential
Year
2024
Status
Completed

Optimization of the installed capacity of this 20 kV PV plant with low-carbon modules: update of the layout plan and single-line diagram, PVsyst yield studies, bill of materials and CAPEX estimate.

Confidential
Portugal
PV
Power
13 MWp
Client
Confidential
Year
2024
Status
Completed

Basic engineering design (BED).

Confidential
Spain
PV
Power
30 MWp
Client
Confidential
Year
2023
Status
In progress

Optimization of the PV plant layout for different table configurations using PVsyst. Preparation of detailed layout drawings.

Suncable AAPL
Australia Asia Power Link
Australia
PV
Power
6 GWp (blocks of 72MWp)
Client
Confidential
Year
2022
Status
Completed

Sizing of DC cables using cycling and thermal sizing to optimize trench design and cables section.

Commissioning

Clashwilliam PV plant
Ireland
PV
Power
50 MWp
Year
2026
Status
In progress

Commissioning management.

Confidential
Ireland
PV
Power
42 MWp
Client
Confidential
Year
2026
Status
In progress

Commissioning management: preparation of the commissioning plan and energization sequence, then on-site management of the sub-contractors' commissioning activities through to grid connection.

Middleton House PV plant
Ireland
PV
Power
75 MWp
Year
2025-2026
Status
In progress

Commissioning management: on-site testing, document preparation and review, grid connection tests.

BESS CCG Blénod
integrated with an EDF combined-cycle gas power plant
France
BESS
Power
17 MW / 18 MWh
Year
2024-2025
Status
Completed

Commissioning supervision: schedule coordination, verification of the test procedures and reports, and supervision of the transformer, battery system, hot commissioning, SCADA, EMS and RTE tests.

Karavasta PV plant
Largest PV plant in the Balkans
Albania
PV
Power
140 MWp
Grid connection
220 kV
Client
Voltalia
Year
2024
Status
Completed

Supervision of the global commissioning: preparation of the commissioning plan and energization sequence, then on-site management of the sub-contractors' commissioning activities through to grid connection, including the SCADA and trackers;

Automation & SCADA

12 BESS Projects
France
BESS
Power
From 2 to 15 MW
Client
Confidential
Year
2026-2027
Status
In progress

Design, supply and commissioning of SCADA and PPC for several BESS plants. The scope covers the control cabinets, the functional analysis, the development of operator views and telecontrol gateways to the operator hypervisor and the aggregator, eDEIE management, factory acceptance and cold and hot commissioning.

Confidential
France
PV
Power
15 MWp
Grid connection
20 kV
Client
Confidential
Year
2026
Status
In progress

Design, supply and commissioning of the SCADA and the PPC of an MV-connected PV plant. The scope covers the cabinets, the functional analysis, the development of the views and telecontrol gateways to the hypervisor and the aggregator, eDEIE management and cold and hot commissioning.

VERT
France
Hybrid PV + BESS
Power
78 MWp + 19 MW / 31 MWh
Grid connection
20kV
Client
ZE Energy
Year
2025
Status
Completed

Commissioning support: participation in the cold and hot commissioning tests across the plant's five feeders, review of the EMS, communication and regulation test procedures and reports, and back-office technical support on non-conformities.

Confidential
Italy
BESS
Power
100 MW / 800 MWh
Client
Confidential
Year
2025
Status
Completed

Preliminary design study for the SCADA control system of a BESS plant: system architecture diagram, functional specification, bill of quantity and RACI matrix

Confidential
Revamping automation
France
Hybrid PV + BESS
Power
8 MWp + 6 MW / 13 MWh
Client
Confidential
Year
2024
Status
Completed

On-site audit of the installations and diagnosis of the automation system of this hybrid PV and battery storage plant.

Confidential
Italy
BESS
Power
12 MW / 7 MWh
Client
Confidential
Year
2024
Status
Completed

Supervision of overall commissioning and testing of communication and SCADA systems.

Confidential
France
Hybrid PV + BESS
Power
20 MWp + 7.5 MW / 15 MWh
Client
Confidential
Year
2023
Status
Completed

Commissioning support and troubleshooting of complex issues on this hybrid PV and battery storage plant.

We're interested in your project

Contact us to discuss.

Get in touch